Dubai metro Friday Timings

Dubai metro Friday Timings

Public transport users; this is the Dubai Metro Guide! Since its launch in the year 2009, the Dubai Metro has changed the scenery of the city. Now traveling around the city has become easier and more affordable. Since this article is an integral part of life in Dubai, this article provides you with a complete guide to the metro dates of Dubai today.

Friday timings for Dubai metro

Redline Friday timing is from 10 am to 1 am. Whereas the Greenline Friday timing is also 10 am to 1 am.

The Dubai Metro is one of the fast rail networks in Dubai, United Arab Emirates. Both the red and green lines are running, and the other line is still under construction. All trains are fully automated and uncrewed, with air conditioning and with platform edge doors installed with each station to achieve the goal.  Aedas, the construction company, has designed the 45 stations in the subway, two warehouses, and a state of the art operations control center. The builder of the metro is Al Ghurair Investment Group.

The first part of the red line covered ten stations, and it was opened in the year  September 9, 2009, by the Dubai ruler Mohammed bin Rashid Al Maktoum. The track is open to the public on the morning of September 10 (UTC 04:00) on June 6. The Dubai Metro is the first largest urban train network in the Arabian Peninsula and the second train network in the Arab world (after the Cairo Metro), and the third (in the case of Baghdad Metro with limited ground service).  It was announced in the year 2015 that the Red Line would be significantly expanded to extend the 15-kilometer track and extend it from Ibn Battuta to the Expo 2020 venue. Seven subway stations were added to the development.

Just in the first two days of operation, more than 110,000 people used the metro. 
Atkins Engineering & Consulting provides a comprehensive, multidisciplinary civil engineering and construction management project for Dubai Metro. Despite this, the red line is still 52.1 kilometers (32.4 miles), which is still the longest unmanned single subway line in the world.

Dubai is famous for its exquisite and luxurious infrastructure. With the growth of Dubai’s population and the increase in tourism, it has imposed a burden on Dubai’s transportation structure.

The Dubai Rapid Rail network trains are driverless and have areas for women and children and first-class passengers. From the train, you can enjoy the beautiful view of the city.

The Dubai Metro is operating throughout the week. Dubai Metro has slightly different working hours for the red and green lines.

Leave a Reply

Your email address will not be published. Required fields are marked *